BN Business News
Додати компанію →
Цей переклад готується. Тимчасово ми показуємо оригінальну версію англійською мовою.

Енергетика та довкілля · 30.06.20231 хв читання

Desert Southwest Region-Rate Order No. WAPA-209

Локальний автоматичний переклад · Оригінальна мова джерела

Короткий зміст

The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes new formula rates for firm and nonfirm point-to-point (P2P) and network integration (Network) transmission service. DSW also proposes to revise the existing formula rates for Parker-Davis Project (PDP) firm electric service (FES) and firm transmission service of Salt Lake City Area/Integrated Projects (SLCA/ IP) power. The proposed new formula rates and revisions to existing formula rates would combine the transmission service rates of the Central Arizona Project (CAP), the southern portion of the Pacific Northwest-Pacific Southwest Intertie Project (Intertie), and PDP; and the facilities use charge for the Electrical District No. 5 to Palo Verde Hub Project (ED5-PVH). DSW's proposed formula rates will be effective January 1, 2024, through September 30, 2028. Publication of this Federal Register notice begins the formal process for the proposed formula rates.

Оригінальна мова джерела: Federal Register — Energy DepartmentВідкрити оригінальне повідомлення →

Інші тематичні добірки

Ділова аналітика →