Uluslararası ticaret · 10.03.20111 dk okuma
Polyethylene Terephthalate Film, Sheet, and Strip (PET Film) From Taiwan: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
Polyethylene Terephthalate Film, Sheet, and Strip (PET Film) From Taiwan: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review