Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.
Düzenleme ve hukuk · 11.09.20081 dk okuma
Office Electricity Delivery and Energy Reliability; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
On May 19, 2008, CPV Maryland, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self- certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. Section 201(d) of FUA requires DOE to publish a notice of receipt of self-certifications in the Federal Register.
Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →