BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 30.11.19991 dk okuma

Notice of Preliminary Results of Antidumping Duty New Shipper Review and Extension of Time Limit for Final Results of New Shipper Review: Oil Country Tubular Goods From Canada

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

In response to a request from the respondent, Atlas Tube, Inc. (``Atlas''), the Department of Commerce (the ``Department'') is conducting a new shipper review of the antidumping duty order on oil country tubular goods (``OCTG'') from Canada. This review covers one manufacturer/exporter, Atlas, and the period June 1, 1998 through November 30, 1998. We have preliminarily determined the dumping margin for Atlas to be 0.86 percent during the period June 1, 1998, through November 30, 1998. Interested parties are invited to comment on these preliminary results. Parties who submit argument in this proceeding are requested to submit with the argument: (1) a statement of the issue; and (2) a brief summary of the argument.

Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →