BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

İş dünyası · 08.05.20132 dk okuma

Oglethorpe Power Corporation: Proposed Biomass Power Plant

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

The Rural Utilities Service (RUS) has issued a Record of Decision (ROD) for the Environmental Impact Statement (EIS) related to providing financial assistance to the Oglethorpe Power Corporation (Oglethorpe) for the construction of a 100 megawatt (MW) biomass plant and related facilities (Proposal) in Warren County, Georgia. The Administrator of RUS has signed the ROD, which was effective upon signing. The EIS was prepared pursuant to the National Environmental Policy Act (NEPA) (U.S.C. 4231 et seq.) and in accordance with the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA (40 CFR Parts 1500-1508) and RUS' Environmental Policies and Procedures (7 CFR part 1794). As the lead federal agency, and as part of its broad environmental review process, RUS must take into account the effect of the Proposal on historic properties in accordance with Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulation "Protection of Historic Properties" (36 CFR Part 800). Pursuant to 36 CFR 800.2(d)(3), RUS used its procedures for public involvement under NEPA, in part, to meet its responsibilities to sol

Kaynağın orijinal dili: Federal Register — Agriculture DepartmentOrijinal duyuruyu açın →