BN Business News
Добавить компанию →
Этот перевод готовится. Пока мы временно показываем оригинальную версию на английском языке.

Международная торговля · 01.05.20142 мин чтения

Notice of Receipt of an Application by Otay Water District for Issuance of a Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of a Cross-Border Pipeline Facility for the Importation of Desalinated Water on the Border of the United States and Mexico

Локальный автоматический перевод · Язык оригинального источника

Краткое содержание

Notice is hereby given that on November 25, 2013, the Department of State (DOS) received notice from the Otay Water District ("Otay Water") that it seeks a Presidential Permit authorizing the construction, connection, operation, and maintenance of a cross-border pipeline facility for the importation of desalinated seawater on the border of the United States and Mexico in San Diego County, California. The Department will be working with Otay Water to conduct environmental analyses consistent with the National Environmental Policy Act ("NEPA") and the California Environmental Quality Act ("CEQA") for the Otay Mesa Conveyance System Project that would convey desalinated seawater from the new border crossing approximately four miles northeast to Otay Water's Roll Reservoir in San Diego County ("the Project"). The Project would provide a new water supply source from the U.S.-Mexico border to Otay Water's potable water system and ultimately delivered to end-user customers in the United States which Otay Water contends will reduce the strain and demand on the overall region's limited water supply." Under E.O. 11423, as amended, the Secretary of State is designated and empowered to receive

Язык оригинального источника: Federal Register — State DepartmentОткрыть исходное сообщение →

Другие тематические подборки

Деловая аналитика →