Энергетика и окружающая среда · 28.05.20241 мин чтения
Northern States Power Company; Prairie Island Independent Spent Fuel Storage Installation; License Amendment Application
Локальный автоматический перевод · Язык оригинального источника
Краткое содержание
The U.S. Nuclear Regulatory Commission (NRC) has received a license amendment application from Northern States Power Company (NSPM) for an amendment to Special Nuclear Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation (PI ISFSI) located in Welch, Minnesota. The amendment request seeks to change License Conditions 23(a), 24(A)(2), and 24(B)(2). The subject license conditions are management activities with specified inspection intervals of three months or one quarter. The inspection intervals are "not to exceed every quarter" for license condition 23 and "not to exceed three months" for license condition 24. This is inconsistent with similar independent spent fuel storage installation (ISFSI) technical specifications (TS) surveillance requirements (SRs), for example, SR 3.1.4.1 and SR 3.1.4.2, which give the frequency as 92 days, and ISFSI TS SR 3.0.2, which allows up to 1.25 times the interval specified in the frequency. NSPM proposes to revise the license conditions to describe the inspection intervals similar to TS Surveillance Requirement Frequency, allowing up to 1.25 times the specified intervals to account for scheduling challeng