BN Business News
Добавить компанию →
Этот перевод готовится. Пока мы временно показываем оригинальную версию на английском языке.

Регулирование и право · 08.11.20191 мин чтения

Notice of Release of Land Affecting Federal Grant Assurance Obligations at Tucson International Airport, Tucson, Pima County, Arizona

Локальный автоматический перевод · Язык оригинального источника

Краткое содержание

The Federal Aviation Administration (FAA) proposes to rule and invites public comment for the release of approximately 297 acres of airport land, otherwise known as Parcel H, at Tucson International Airport (TUS), Tucson, Pima County, Arizona from the aeronautical use provisions of the Grant Agreement Assurances since the land is not needed for airport purposes. The land for proposed release consists of two parcels along the southern boundary of the abandoned Hughes Access Road, adjacent to the main airport airfield sand campus, and a portion of property which is used by Aerospace Parkway. The land will be sold to the City of Tucson, to accommodate future expansion of a public roadway, and to permit future compatible development adjacent to United States Air Force Plant 44. The airport will be compensated for the fair market value of the land. The use of the land for a roadway and industrial development represents a compatible land use that will not interfere with the airport or its operation, thereby protecting the interests of civil aviation.

Язык оригинального источника: Federal Register — All DocumentsОткрыть исходное сообщение →

Другие тематические подборки

Деловая аналитика →