BN Business News
Добавить компанию →
Этот перевод готовится. Пока мы временно показываем оригинальную версию на английском языке.

Энергетика и окружающая среда · 01.10.20091 мин чтения

Notice of Extension of Comment Period for Proposed Generic Communication; NRC Regulatory Issue Summary 2005-02, Revision 1, Clarifying the Process for Making Emergency Plan Changes

Локальный автоматический перевод · Язык оригинального источника

Краткое содержание

The U.S. Nuclear Regulatory Commission (NRC) published a notice of opportunity for public comment in the Federal Register (74 FR 42699) on August 24, 2009, proposing to issue a regulatory issue summary (RIS) to clarify the process for making emergency plan changes. This FRN version of the draft Regulatory Issue Summary (RIS) does not include the Attachments and Enclosures as described in the body of the RIS. To view these attachments and enclosures, refer to the NRC's Agencywide Documents Access and Management System (ADAMS), document number ML080710029. The NRC's internal non-concurrence process "Draft Management Directive 10.158, `NRC Non-Concurrence Process'," has been invoked by a member of the NRC staff regarding draft RIS 2005-01, Revision 1. The non-concurrence and supporting information is publically available through ADAMS Accession No. ML092250622.

Язык оригинального источника: Federal Register — Nuclear Regulatory CommissionОткрыть исходное сообщение →

Другие тематические подборки

Деловая аналитика →