Comércio internacional · 01/11/20111 min de leitura
Certain Frozen Warmwater Shrimp From the Socialist Republic of Vietnam: Extension of Time Limit for the Preliminary Results of the New Shipper Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce (the "Department") has decided to extend the time limit for the preliminary results of the new shipper review ("NSR") of the antidumping duty order on certain frozen warmwater shrimp ("shrimp") from the Socialist Republic of Vietnam ("Vietnam") to December 9, 2011. The period of review ("POR") for this NSR is February 1, 2010, through January 31, 2011.