BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Energia e ambiente · 04/06/20241 min de leitura

Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-214

Tradução automática local · Idioma original da fonte

Resumo

The extension of the Rocky Mountain (RM) region's existing Loveland Area Projects (LAP) transmission and LAP, Western Area Colorado Missouri Balancing Authority (WACM), and Colorado River Storage Project (CRSP) ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non-firm point-to-point), L-NFJDT (joint dispatch transmission), L-UU1 (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control support), L-AS3 (regulation), L-AS4 (energy imbalance), L-AS5 (spinning reserves), L-AS6 (supplemental reserves), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance) are set to expire on September 30, 2024. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2026.

Idioma original da fonte: Federal Register — Energy DepartmentAbrir o comunicado original →

Explorar análises

Análises empresariais →