BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 29/11/20241 min de leitura

Notice of Final Nonavailability Waiver of Buy America Requirements for Certain High-Speed Rail Products for the California Inaugural High-Speed Rail Service Project

Tradução automática local · Idioma original da fonte

Resumo

The Federal Railroad Administration (FRA) is issuing a waiver of its Buy America requirements to the California High-Speed Rail Authority (the Authority) to use certain products that are not produced in the United States for use in the California Inaugural High-Speed Rail Service Project between Merced, California and Bakersfield, California (Project). FRA is funding the Project under the Federal- State Partnership for Intercity Passenger Rail Program (FSP Program); therefore, FRA's Buy America requirements apply to the Project. FRA's Buy America requirements include both FRA's statutory requirements, which require 100 percent of the manufactured products and steel and iron used in an FRA-funded project to be produced in the United States, and the Build America, Buy America Act (BABA), which requires that all construction materials used in the FRA-funded project be produced in the United States. FRA is not waiving the applicable BABA requirements for construction materials used in the Project. The final waiver would apply to the aluminum car shells, signal systems, high-speed rail turnouts and fire alarm systems based on the domestic nonavailability of such products, as identified

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →