BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 26/08/20211 min de leitura

Energy Conservation Program: Notification of Petition for Waiver of LRC Coil From the Department of Energy Walk-In Coolers and Walk-In Freezers Test Procedure and Notification of Grant of Interim Waiver

Tradução automática local · Idioma original da fonte

Resumo

This document announces receipt of and publishes a petition for waiver and interim waiver from LRC Coil Company ("LRC Coil"), which seeks a waiver for specified walk-in unit cooler basic models from the U.S. Department of Energy ("DOE") test procedure used to determine the efficiency and energy consumption of walk-in coolers and walk-in freezers. DOE also gives notice of an Interim Waiver Order that requires LRC Coil to test and rate the specified walk-in unit cooler basic models in accordance with the alternate test procedure set forth in the Interim Waiver Order. DOE solicits comments, data, and information concerning LRC Coil's petition and the alternate test procedure specified in the Interim Waiver Order so as to inform DOE's final decision on LRC Coil's waiver request.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →