BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Mercado de trabalho · 05/04/20101 min de leitura

Job Corps: Preliminary Finding of No Significant Impact (FONSI) for the Installation of a Small Wind Turbine at the Pine Ridge Job Corps Center Located at 15710 Highway 385, Chadron, NE 69337

Tradução automática local · Idioma original da fonte

Resumo

Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d), gives notice that an Environmental Assessment (EA) has been prepared for a proposed Wind Turbine Installation to be located at the Pine Ridge Job Corps Center, 15710 Highway 385, Chadron, NE 69337. Through the EA and consultation with the U.S. Fish and Wildlife and the Nebraska Game and Parks Commission, the proposed plan for the construction of a wind turbine at the Pine Ridge Job Corps Center will have no significant environmental impact. This Preliminary Finding of No Significant Impact (FONSI) will be made available for public review and comment for a period of 30 days.

Idioma original da fonte: Federal Register — Department of LaborAbrir o comunicado original →

Explorar análises

Análises empresariais →