Energia e ambiente · 03/08/20161 min de leitura
Virginia Electric Power Company; Surry Power Station, Unit Nos. 1 and 2; Use of AREVA's M5® Alloy Fuel Rod Cladding Material
Tradução automática local · Idioma original da fonte
Resumo
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a September 30, 2016, request from Virginia Electric Power Company (Dominion or the licensee) in order to use AREVA's M5[supreg] alloy fuel rod cladding material at Surry Power Station, Unit Nos. 1 and 2 (SPS).