BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Energia e ambiente · 07/04/20101 min de leitura

Chlorantraniliprole; Extension of Time-Limited Pesticide Tolerances

Tradução automática local · Idioma original da fonte

Resumo

This regulation extends the time-limited tolerances for indirect or inadvertent residues of the insecticide chlorantraniliprole (3-bromo-N-[4-chloro-2-methyl-6-[(methylamino)carbonyl]phenyl]-1-(3- chloro-2-pyridinyl)-1H-pyrazole-5-carboxamide) in or on grain, cereal, forage, fodder, and straw, group 16; leek; onion, green; onion, Welsh; peanut, hay; shallot; soybean, forage; soybean, hay; and vegetable, leaves of root and tuber, group 2 at 0.20 parts per million (ppm). The current tolerances are set to expire on April 10, 2010. This rule extends the expiration/revocation date of these time-limited tolerances for an additional 4-year period, to April 10, 2014.

Idioma original da fonte: Federal Register — Environmental Protection AgencyAbrir o comunicado original →

Explorar análises

Análises empresariais →