BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 07/11/20082 min de leitura

Port of Moses Lake-Construction Exemption-Moses Lake, WA [STB Finance Docket No. 34936 (Sub-No. 1)]; Port of Moses Lake-Acquisition Exemption-Moses Lake, WA

Tradução automática local · Idioma original da fonte

Resumo

By petition filed on August 28, 2008, the Port of Moses Lake (Port) seeks an exemption under 49 U.S.C. 10502 from the prior approval requirements of 49 U.S.C. 10901 to construct rail lines in Grant County, Washington. In the same petition, the Port also seeks an exemption under 49 U.S.C. 10502 from the prior approval requirements of 49 U.S.C. 10901 to acquire an existing segment of rail line from Columbia Basin Railroad Company, Inc. (CBRW). The Board, through its Section of Environmental Analysis (SEA), and the Washington State Department of Transportation (WSDOT) are co-lead agencies responsible for the environmental review of the proposed rail project and the preparation of the Environmental Assessment (EA). The proposed project, known as the Northern Columbia Basin Railroad Project, includes the construction of two new rail line segments and the acquisition and refurbishment of an existing rail segment to provide rail access to land designated and zoned for industrial uses along Wheeler Road (Road 3 NE) and at the Grant County International Airport (GCIA). The entire proposed route would extend approximately 11.5 miles. For Segment 1, the Port proposes to construct a rail line

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →