BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 16/09/19981 min de leitura

Industrial Phosphoric Acid From Belgium; Extension of Time Limit for Final Results of Antidumping Duty Administrative Review

Tradução automática local · Idioma original da fonte

Resumo

The Department of Commerce (``the Department'') is extending the time limit for the final results of the antidumping duty administrative review of the antidumping order on industrial phosphoric acid from Belgium. This review covers 1 producer/exporter of industrial phosphoric acid. The period of review is August 1, 1996 through July 31, 1997.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →