BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Energia e ambiente · 08/11/20121 min de leitura

Fiscal Year (FY) 2014-2015 Proposed Power and Transmission Rate Adjustments; Public Hearing and Opportunities for Public Review and Comment

Tradução automática local · Idioma original da fonte

Resumo

BPA is holding a consolidated rate proceeding, Docket No. BP- 14, to establish power and transmission rates for FY 2014-2015. The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review and revise its rates so that they recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, including amortization of the Federal investment in the Federal Columbia River Power System (FCRPS) over a reasonable number of years and BPA's other costs and expenses. The Northwest Power Act also requires that BPA's rates be established based on the record of a formal hearing, and for transmission rates only, that the costs of the Federal transmission system be equitably allocated between Federal and non-Federal power utilizing the system. By this notice, BPA announces the commencement of a power and transmission rate adjustment proceeding for power, transmission, control area services, and ancillary services rates proposed to be effective on October 1, 2013.

Idioma original da fonte: Federal Register — Energy DepartmentAbrir o comunicado original →

Explorar análises

Análises empresariais →