Energia i środowisko · 27.05.19981 min czytania
Niagara Mohawk Power Corporation; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing; Correction
Automatyczne tłumaczenie lokalne · Oryginalny język źródła
Streszczenie
This document corrects a notice appearing in the Federal Register on May 19, 1998 (63 FR 27601), that would change Technical Specifications 3/4.6.2, ``Protective Instrumentation,'' to reflect modifications to the initiation instrumentation for the Control Room Air Treatment System. This action is necessary to correct an erroneous date.