BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Regelgeving en recht · 26-10-20101 min lezen

Withdrawal of Notice for Preparation of an Environmental Impact Statement for the Pine Mountain Dam & Lake Project, AR

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The Little Rock District of the U.S. Army Corps of Engineers (Corps) is withdrawing its intent to prepare an Environmental Impact Statement (EIS) for the Pine Mountain Dam & Lake Project, AR. The original Notice of Intent (NOI) was published in the Federal Register on September 25, 2009 (74 FR 48934). The River Valley Regional Water District, sponsor of the study, has recently requested the study be suspended until a later date (to be determined).

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →