BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Energie en milieu · 26-3-20091 min lezen

Proposed Revisions to the License Renewal Interim Staff Guidance Process and Regulatory Issue Summary 2007-16; Request for Public Comment

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The NRC requests public comment on a proposed draft License Renewal Interim Staff Guidance (LR-ISG) Process, Revision 1. This draft incorporates changes to the existing LR-ISG process, dated December 12, 2003, and basic framework for developing and implementing LR-ISGs. The NRC also requests public comment on a proposed revision to NRC Regulatory Issue Summary (RIS) 2007-16. This revision clarifies the role of the LR-ISG process for including "newly identified" systems, structures, and components in accordance with Sec. 54.37(b) of Title 10, Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants," of the Code of Federal Regulations (10 CFR 54.37(b)). The proposed revisions to the LR-ISG process and RIS are available in the NRC's Agencywide Documents Access and Management System (ADAMS), under Accession Nos. ML082180346 and ML083500028, respectively.

Oorspronkelijke brontaal: Federal Register — Nuclear Regulatory CommissionOrigineel bericht openen →