Energie en milieu · 31-7-20091 min lezen
Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses
Lokale automatische vertaling · Oorspronkelijke brontaal
Samenvatting
The Nuclear Regulatory Commission (NRC) is proposing to amend its environmental protection regulations by updating the Commission's 1996 findings on the environmental impacts related to the renewal of a nuclear power plant's operating license. The Commission stated that it intends to review the assessment of impacts and update it on a 10-year cycle, if necessary. The proposed rule redefines the number and scope of the environmental impact issues which must be addressed by the Commission in conjunction with the review of applications for license renewal. As part of this 10-year update, the NRC revised the 1996 Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants. Concurrent with the amendments described in this proposed rule, the NRC is publishing for comment the revised GEIS, a revised Regulatory Guide 4.2, Supplement 1, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, and a revised Environmental Standard Review Plan, Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License Renewal.