Regelgeving en recht · 28-11-20062 min lezen

Approval and Promulgation of Implementation Plans; Georgia: Removal of Douglas County Transportation Control Measure

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

On September 19, 2006, the State of Georgia's Department of Natural Resources, through the Georgia Environmental Protection Division (GA EPD), submitted a final State Implementation Plan (SIP) revision to remove the transportation control measure (TCM) related to a compressed natural gas refueling station/park and ride transportation center project in Douglas County, Georgia. This TCM was originally submitted by GA EPD for inclusion into the Atlanta portion of the Georgia SIP on August 29, 1997. EPA approved this TCM into the Georgia SIP through direct final rulemaking published in the Federal Register on June 24, 1998 (effective on August 10, 1998). Subsequently, the project sponsor determined that the equipment necessary to implement this project is no longer available, and thus, this TCM cannot be implemented as originally anticipated. No SIP credit was claimed for this program, nor were emission benefits ever realized for this TCM because it was never implemented. Through this rulemaking, EPA is proposing to approve the removal of this TCM from the Atlanta portion of the Georgia SIP because this SIP revision meets Clean Air Act requirements. In the Final Rules Section of this F

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →