Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.
Regelgeving en recht · 17-9-19991 min lezen
Certain Circular Welded Carbon Steel Pipes and Tubes From Taiwan; Extension of Time Limit for Final Results of Antidumping Duty Administrative Review
Lokale automatische vertaling · Oorspronkelijke brontaal
Samenvatting
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on certain circular welded carbon steel pipe and tube from Taiwan. The review covers four manufacturers/exporters of the subject merchandise and the period May 1, 1997 through April 30, 1998.
Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →