BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

エネルギーと環境 · 2008/8/221 分で読めます

Office of New Reactors; Interim Staff Guidance on Assessment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures

ローカル自動翻訳 · 情報源の原言語

概要

The NRC is soliciting public comment on its Proposed Interim Staff Guidance (ISG) DC/COL-ISG-07 (ADAMS Accession No. ML081980084). The purpose of this ISG is to clarify the NRC position on identifying winter precipitation events as site characteristics and site parameters for determining normal and extreme winter precipitation loads on the roofs of Seismic Category I structures. This ISG revises the previously issued staff guidance in March 2007 in the Standard Review Plan (SRP) NUREG-0080, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants." The NRC staff issues DC/COL-ISGs to facilitate timely implementation of the current staff guidance and to facilitate activities associated with review of applications for design certifications (DCs) and combined licenses (COLs) by the Office of New Reactors. The NRC staff will also incorporate the approved DC/COL-ISG- 007 into the next revision of the SRP and related guidance documents.

情報源の原言語: Federal Register — Nuclear Regulatory Commission原文の発表を開く →

関連インサイト

ビジネスインサイト →