BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

エネルギーと環境 · 2003/8/252 分で読めます

Notice of Availability of a Standard Review Plan (NUREG-1569) for Staff Reviews for in Situ Leach Uranium Extraction License Applications

ローカル自動翻訳 · 情報源の原言語

概要

The U.S. Nuclear Regulatory Commission (NRC) has developed a Standard Review Plan (NUREG-1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, part 40 (10 CFR part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provide detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the Nat

情報源の原言語: Federal Register — Nuclear Regulatory Commission原文の発表を開く →

関連インサイト

ビジネスインサイト →