BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

エネルギーと環境 · 2002/4/41 分で読めます

Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Draft Environmental Assessment and Finding of No Significant Impact Related to a Proposed License Amendment To Increase the Maximum Rated Thermal Power Level

ローカル自動翻訳 · 情報源の原言語

概要

The NRC has prepared a draft environmental assessment of a request by Carolina Power & Light Company (CP&L or the licensee) for a license amendment to increase the maximum thermal power level at Brunswick Steam Electric Plant (BSEP), Units 1 and 2, from 2558 megawatts thermal (MWt) to 2923 MWt, which is a power increase of 14.3 percent (approximately 15 percent). As stated in the NRC staff's February 8, 1996, position paper on the Boiling-Water Reactor Extended Power Uprate Program, the staff has the option of preparing an environmental impact statement if it believes an extended power uprate (EPU) will have significant impact on the human environment. The staff did not identify a significant impact from the EPU at BSEP Units 1 and 2; therefore, the NRC staff is documenting its environmental review in an environmental assessment (EA). In accordance with the February 8, 1996, staff position paper, the draft EA and finding of no significant impact is being published in the Federal Register with a 30-day public comment period.

情報源の原言語: Federal Register — Nuclear Regulatory Commission原文の発表を開く →

関連インサイト

ビジネスインサイト →