BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 08/09/20111 min di lettura

Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Train Project Fresno to Bakersfield Section

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Fresno to Bakersfield Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for an extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority plans to construct and operate a fully grade- separated, dedicated double-track, electric powered, passenger rail, high-speed railroad along a 114-mile corridor between Fresno and Bakersfield, CA. The Project includes stations in downtown Fresno and Bakersfield, and a possible Kings/Tulare Regional Station east of Hanford, CA. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Fresno to Bakersfield Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reaso

Lingua originale della fonte: Federal Register — Transportation DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →