BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 12/12/20112 min di lettura

Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 18/151 (Verona Road) CTH PD to US 12/14 and US 12/14 (Beltline) Whitney Way to Todd Drive in Dane County, Wisconsin. Those actions grant approvals for the project. The project will be constructed in three stages. Stage 1 entails reconstructing the current US 18/151 and US 12/14 diamond interchange to a single-point urban interchange and extending the six-lane US 12/14 section west through the Whitney Way interchange. The Beltline reconstruction will extend from west of Whitney Way to east of Seminole Highway and will include reconstruction of the Seminole Highway overpass. The US 12/14 modifications will include expanding the Whitney Way westbound off-ramp and the Whitney Way eastbound on-ramp to two lanes and add a parallel lane to the Whitney Way westbound on-ramp. US 18/151 (Verona Road) will be reconstructed from Raymond Road to US 12/14 and include capacity expansion. Midvale Boulevard will be reconstructed between US 12/14 and Nakoma Road. A jug-handle grade-separated intersection will be constructed at the current Summ

Lingua originale della fonte: Federal Register — Transportation DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →