BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 24/10/20241 min di lettura

Track Geometry Measurement System (TGMS) Inspections

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

FRA is proposing to revise its regulations governing the minimum safety requirements for railroad track. The proposed changes would require all Class I and II railroads, as well as intercity passenger railroads and commuter railroads, to operate a qualifying Track Geometry Measurement System (TGMS), a type of automated track inspection (ATI) technology, at specified frequencies on all Class 1 through 5 mainline and controlled siding track that transports: annual tonnage greater than 10 million gross tons (MGT); regularly scheduled passenger rail service; or trains containing hazardous materials. FRA also proposes increasing the required frequency of TGMS inspections on Class 6 track.

Lingua originale della fonte: Federal Register — Transportation DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →