BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Regolamentazione e diritto · 02/10/20092 min di lettura

National Mall and Memorial Parks, Washington, DC; Notice of Availability of a Finding of No Significant Impact for the Proposed West Potomac Park Levee Project

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

Pursuant to the National Environmental Policy Act (NEPA) and National Park Service (NPS) NEPA guidelines, NPS prepared and, from January 30 to March 2, 2009, made available for a 30-day public review an Environmental Assessment (EA) evaluating the potential impacts of proposed improvements to the existing West Potomac Park Levee System which extends from 23rd Street, NW., to the grounds of the Washington Monument in Washington, DC. The goal of this project is to improve the reliability of the existing levee in order to meet the current post- Hurricane Katrina standards for flood protection as required by the U.S. Army Corps of Engineers (USACE) and the Federal Emergency Management Agency (FEMA). The existing levee protects much of the monumental core and large portions of downtown Washington, DC. After the end of the 30-day public review period, the NPS selected for implementation, the preferred alternative as described in the EA, and determined it will not have a significant impact on the quality of the human environment and that an Environmental Impact Statement is not required. In making that selection and determination, the NPS considered the information and analysis contained

Lingua originale della fonte: Federal Register — All DocumentsApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →