Imprese · 31/08/20261 min di lettura
Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida
Traduzione automatica locale · Lingua originale della fonte
Riepilogo
The FHWA, on behalf of the FDOT, is issuing this notice to announce actions taken by FDOT and other Federal Agencies that are final agency actions. These actions relate to the proposed State Road (S.R.) 30 (U.S. 98) Project Development and Environment (PD&E) Study (Financial Management Number 220260-3-22-01), referred to as "Around the Mound." The proposed S.R. 30 (U.S. 98) project will add capacity to S.R. 30 (U.S. 98) from S.R. 189 (Beal Parkway) to the West End of Brooks Bridge, and north along S.R. 85 (Eglin Parkway) to Hollywood Boulevard, a distance of approximately 0.6 miles along S.R. 30 (U.S. 98). Improvements consist of roadway widening from four to six lanes, improvements at signalized intersections, changes to the S.R. network involving portions of S.R. 30 (U.S. 98), S.R. 85, and S.R. 145; and the construction of stormwater management facilities.