Regolamentazione e diritto · 16/11/20061 min di lettura
Drawbridge Operation Regulations; Long Island, New York Inland Waterway from East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY
Traduzione automatica locale · Lingua originale della fonte
Riepilogo
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Loop Parkway Bridge across Long Creek at mile 0.7, at Jones Beach, New York. Under this temporary deviation, the Loop Parkway Bridge need not open for the passage of vessel traffic from 8:30 a.m. through 11:30 a.m. and 1:30 p.m. through 4:30 p.m., daily, from November 5, 2006 through December 20, 2006. A single bridge opening for all inbound commercial fishing vessels shall be provided, if a request to open the bridge is given, during the 1:30 p.m. to 4:30 p.m. bridge closure period. This deviation is necessary to facilitate scheduled bridge maintenance.