BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Regolamentazione e diritto · 30/09/19991 min di lettura

Notice of Floodplain and Wetlands Involvement for Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The Department of Energy (DOE) proposes to transfer the 56.4 acres and approximately 35 structures that comprise the DOE Grand Junction Office (GJO) to non-DOE ownership. A portion of the facility is located in the 100-year floodplain of the Gunnison River and there are several jurisdictional wetlands located within the property boundary. The facility is located in Mesa County, Colorado. In accordance with 10 CFR part 1022, DOE will prepare a floodplains and wetlands assessment and will perform this proposed action in a manner that will avoid or minimize potential harm to or within the affected floodplain and wetlands. The assessment will be conducted in conjunction with an Environmental Assessment (EA) that analyzes the potential environmental affects of the transfer of the property.

Lingua originale della fonte: Federal Register — All DocumentsApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →