BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 27/02/20131 min di lettura

Bridger-Teton National Forest; Wyoming; Teton to Snake Fuels Management Project

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The Forest Service is preparing an environmental impact statement (EIS) to document the potential effects of the Teton to Snake Fuels Management Project. The analysis will evaluate and disclose the effects of treating National Forest land to reduce the potential fire behavior within the wildland-urban interface to better protect threatened values, to improve firefighter safety, and to allow fire to play a more natural role in the ecosystem. Treatments include understory thinning and prescribed fire some of which are located within the Palisades Wilderness Study Area (WSA) and Inventoried Roadless Areas (IRAs). Connected actions necessary to implement the proposed treatments include road maintenance, reconstruction, temporary road and landing construction and obliteration, and construction of fire control lines where needed to contain prescribed fire treatments. No road work or commercial vegetation treatments would occur within the WSA. Road maintenance would occur in a small portion of the Phillips Ridge IRA but no reconstruction would occur. The project is located in Teton and Lincoln Counties, Wyoming, west of the Jackson Hole valley and Snake River corridor, and east of the Car

Lingua originale della fonte: Federal Register — Agriculture DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →