Entreprise · 24/10/20112 min de lecture
Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin
Traduction automatique locale · Langue originale de la source
Résumé
This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County, Wisconsin. Those actions grant approvals for the project. The project will widen the US 41 freeway mainline from 4 to 6 lanes and add auxiliary lanes at certain locations along US 41 northbound and southbound from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive and reconstruct the Velp Avenue, I-43, and County M interchanges. The I-43/US 41 interchange will be reconstructed as a System Interchange with directional ramps and will include a realignment of the US 41 mainline, raising of the northbound gradeline, and elimination of existing access between Velp Avenue and I-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance of approximately 3.5 miles and the project limits on I-43 extend from US 41 to Atkinson Drive, a distance of approximately 2 miles. The project also includes construction of roundabouts, construction of new bridges and replacement of existing bridges.