BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 26/12/20232 min de lecture

Notice of Proposed Nonavailability Waiver of Buy America Requirements for the Nevada Department of Transportation To Purchase Certain High-Speed Rail Components

Traduction automatique locale · Langue originale de la source

Résumé

The Federal Railroad Administration (FRA) is seeking comments on whether to grant a waiver of its Buy America requirements to the Nevada Department of Transportation (NVDOT) for certain components that are not produced in the United States for use in a high-speed passenger train project between Las Vegas, NV and Rancho Cucamonga, CA (Project). FRA selected the Project for funding under the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program), and therefore, FRA's Buy America requirements apply to the Project. FRA's Buy America requirements include both FRA's statutory requirements, which require 100 percent of the manufactured products and steel and iron used in an FRA-funded project to be produced in the United States, and the Build America, Buy America Act (BABA), which requires that all construction materials used in the FRA-funded project be produced in the United States. FRA is not proposing to waive the applicable BABA requirements for construction materials used in the Project, and therefore this proposed waiver would not apply to the construction materials used in the Project. The proposed waiver would apply to the trainset, signal systems, high-spee

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →