BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 25/08/20211 min de lecture

Safety Zone; M/V ZHEN HUA 24, Crane Delivery Operation, Chesapeake Bay and Patapsco River, Baltimore, MD

Traduction automatique locale · Langue originale de la source

Résumé

The Coast Guard is establishing a temporary safety zone for certain waters of the Chesapeake Bay and Patapsco River. This action is necessary to provide for the safety of life on these navigable waters during the movement of the M/V ZHEN HUA 24 while it is transporting four new Super-Post Panamax container cranes to the Port of Baltimore. M/V ZHEN HUA 24 is anticipated to arrive between August 26, 2021 and September 15, 2021. This rulemaking will prohibit persons and vessels from being in the safety zone unless authorized by the Captain of the Port Maryland-National Capital Region or a designated representative.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →