Réglementation et droit · 16/12/20161 min de lecture
Notice of Availability of the Draft Missouri River Recovery Management Plan and Environmental Impact Statement
Traduction automatique locale · Langue originale de la source
Résumé
The Kansas City and Omaha Districts of the U.S. Army Corps of Engineers (USACE), in cooperation with the U.S. Fish and Wildlife Service (USFWS), have developed the Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-EIS). This document is a programmatic assessment of (1) major federal actions necessary to avoid a finding of jeopardy to the pallid sturgeon (Scaphirhynchus albus), interior least tern (Sterna antillarum athalassos), and the Northern Great Plains piping plover (Charadrius melodus) caused by operation of the Missouri River Mainstem and Kansas River Reservoir System and operation and maintenance of the Missouri River Bank Stabilization and Navigation Project (BSNP) in accordance with the Endangered Species Act (ESA) of 1973, as amended; and (2) the Missouri River BSNP fish and wildlife mitigation plan described in the 2003 Record of Decision (ROD) and authorized by the Water Resources Development Acts (WRDA) of 1986, 1999, and 2007.