BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 15/09/20061 min de lecture

Proposed Water Service Contract, El Dorado County Water Agency, El Dorado County, CA

Traduction automatique locale · Langue originale de la source

Résumé

Pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969 (as amended) and Section 21061 of the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation) and El Dorado County Water Agency (EDCWA) intend to prepare a joint EIS/EIR for a Municipal and Industrial (M&I) water service contract from the Central Valley Project (CVP), California. The proposed project consists of a long term water supply contract under which Reclamation would provide up to 15,000 acre-feet per annum (AFA) to the EDCWA for diversion from Folsom Reservoir or for exchange upstream on the American River. The EDCWA proposes to sub-contract this water equally between El Dorado Irrigation District (EID) and Georgetown Divide Public Utility District (GDPUD). EID proposes to take its supply from Folsom Reservoir. GDPUD proposes to take its supply upstream by way of a water exchange with Placer County Water Agency (PCWA). The GDPUD diversion facility is at the American River Pump Station which is currently under construction.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →