BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 28/11/20061 min de lecture

Folsom Dam Safety and Flood Damage Reduction (DS/FDR) Action-Sacramento, El Dorado, and Placer Counties, CA

Traduction automatique locale · Langue originale de la source

Résumé

Pursuant to section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA), CEQ NEPA Regulations (40 CFR 1502.9[c][1]), and Public Resources Code, sections 21000-21177 of the California Environmental Quality Act (CEQA) and the California Code of Regulations, title 14, section 15088.5 of the CEQA Guidelines, the Bureau of Reclamation (Reclamation), the lead Federal agency; the U.S. Army Corps of Engineers (Corps), a cooperating Federal agency; the Reclamation Board of the State of California, the lead State agency; and the Sacramento Area Flood Control Agency (SAFCA), the local sponsor, have made available for public review and comment a Draft EIS/ EIR for the Folsom DS/FDR Action. The Folsom DS/FDR Draft EIS/EIR describes five action alternatives which include numerous features that address previously identified and ongoing dam safety, flood damage reduction, and security issues by modifying Folsom Dam and Appurtenant Structures (the Folsom Facility). The alternatives include features that would address Reclamation's dam safety objectives and the Corps' flood damage reduction objectives jointly, as well as features or increments that would exclusively address dam safety,

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →