BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 08/01/20041 min de lecture

Notice of Intent To Prepare an Environmental Impact Statement for the Andrade Port of Entry Expansion/Renovation

Traduction automatique locale · Langue originale de la source

Résumé

The action to be evaluated by this EIS is the expansion/ renovation of the existing Andrade POE, located in Andrade, California, to improve the safety, security, and operations of the POE, and to maintain control over ever-present illegal activities at the border. The facility serves vehicular and pedestrian traffic into and out of the Mexican town of Algodones. Expansion/renovation of this facility is proposed to respond to the substantial increase in the flow of both vehicles and pedestrians. The existing POE facility is not equipped to process the number of vehicles and pedestrians anticipated at a level of service consistent with the Federal Inspection Service minimum standards for processing time and overall operational efficiency. The current facility layout requires northbound pedestrians to cross both lanes of SR-186 upon exiting the pedestrian inspection facility, which impedes vehicle circulation, hinders vehicle inspection efficiency, and presents a hazard to those pedestrians. Alternatives: Four build alternatives for the proposed project are currently under consideration and will be analyzed in the EIS for potential environmental impacts. In addition, the "no build" al

Langue originale de la source: Federal Register — General Services AdministrationOuvrir le communiqué original →

Explorer les analyses

Analyses business →