BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 23/11/20012 min de lecture

Floodplain/Wetland Involvement at the Supply Creek Crossing for the Granby Pumping Plant-Marys Lake 69-Kilovolt Transmission Line, Grand County, Colorado

Traduction automatique locale · Langue originale de la source

Résumé

Western Area Power Administration (Western), a power marketing agency of the U.S. Department of Energy (DOE), is the lead Federal agency for a proposal to reroute a 0.8 mile section of the Granby Pumping Plant-Marys Lake 69-kilovolt (kV) transmission line, located in Grand County, Colorado, approximately 10 miles north of the Town of Granby. Western plans to remove eight wood-pole H-frame structures from the existing right-of-way and relocate them farther to the west, a distance ranging from a few hundred feet to approximately 1,000 feet. All the proposed work will likely occur within a 100-year floodplain of Supply Creek. Both the existing transmission line and the proposed reroute cross a wetland associated with Supply Creek, as well as an irrigated meadow. The landowner has requested that Western relocate this section of line to facilitate his ongoing ranching operations. Access to this section of transmission line for maintenance is difficult due to hay meadow irrigation and naturally occurring wet conditions. Relocation of the line will reduce the number of transmission line structures presently located within the wetland area. In accordance with the DOE's Floodplain/Wetland R

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →