BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 25/10/20002 min de lecture

Office of the Assistant Secretary, Water and Science; Central Utah Project Completion Act; Notice of Intent to Negotiate a Contract among the Central Utah Water Conservancy District, Heber Light and Power, and the Department of the Interior for Non-Federal Hydroelectric Power Development at Jordanelle Dam, Central Utah Project, Utah

Traduction automatique locale · Langue originale de la source

Résumé

The CUP's Bonneville Unit, located in northern Utah, was authorized for construction, including hydroelectric power, by the Colorado River Storage Project (CRSP) Act of April 11, 1956 (ch. 203, 70 Stat. 105)(CRSPA). The United States constructed Jordanelle Dam under the CRSPA. The Central Utah Project Completion Act (CUPCA), comprised of Titles II-VI of the Act of October 30, 1992 (106 Stat. 4600, Pub. Law 102-575) authorized the construction of other features of the Bonneville Unit. Section 208 of the CUPCA provides that power generation facilities associated with the CUP be developed and operated in accordance with the CRSPA, which explicitly embodies all Reclamation law except as otherwise provided in the CRSPA. In accordance with a Federal Register notice published July 2, 1999 (Volume 64, Number 127, Pages 36030--36032), Interior, in consultation with the Western Area Power Administration, selected the joint proposal of the District/HL&P to develop non-federal hydroelectric power at Jordanelle Dam through a lease of power privilege. A lease of power privilege is an alternative to federal hydroelectric power development. A lease of power privilege grants to a non-federal entity

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →