BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 19/07/19991 min de lecture

Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Traduction automatique locale · Langue originale de la source

Résumé

The Nuclear Regulatory Commission (NRC) is amending its power reactor safety regulations to require that licensees assess the effect of equipment maintenance on the plant's capability to perform safety functions before beginning maintenance activities on structures, systems, and components (SSCs) within the scope of the maintenance rule. The amendments clarify that these requirements apply under all conditions of operation, including shutdown, and that the assessments are to be used so that the increase in risk that may result from the maintenance activity will be managed to ensure that the plant is not inadvertently placed in a condition of significant risk or a condition that would degrade the performance of safety functions to an unacceptable level. These amendments permit licensees to limit the scope of the assessments to SSCs that a risk-informed evaluation process has shown to be significant to public health and safety.

Langue originale de la source: Federal Register — Nuclear Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →