Réglementation et droit · 06/11/19981 min de lecture
Environmental Assessment Prepared for Proposed Central Gulf Sale 172 on the Gulf of Mexico Outer Continental Shelf
Traduction automatique locale · Langue originale de la source
Résumé
The Minerals Management Service (MMS) has prepared an environmental assessment (EA) for the proposed annual Lease Sale 172 for the Central Planning Area of the Gulf of Mexico Outer Continental Shelf. In this EA, MMS has reexamined the potential environmental effects of the proposed action and alternatives based on any new information regarding potential impacts and issues that was not available at the time the Final Environmental Impact Statement (FEIS) for Lease Sales 169, 172, 175, 178, and 182 was prepared. In summary, no new significant impacts were identified for proposed Lease Sale 172 that were not already assessed in the FEIS for Lease Sales 169, 172, 175, 178, and 182. As a result, MMS determined that a supplemental EIS is not required and prepared a Finding of No New Significant Impact.