Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 15/10/19971 min de lecture
Certain Fresh Cut Flowers From Colombia: Extension of Time Limit of Antidumping Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce is extending the time limit for the preliminary results in the administrative review of the antidumping order on certain fresh cut flowers from Colombia, covering the period March 1, 1996, through February 28, 1997, since it is not practicable to complete the review within the time limits mandated by section 751(a)(3)(A) of the Tariff Act of 1930, as amended, 19 U.S.C. 1675 (a)(3)(A).
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →