BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 24/10/19951 min de lecture

Power Rate Adjustment: Mission Valley Power Utility, Montana; Notice of Rate Increase

Traduction automatique locale · Langue originale de la source

Résumé

The Bureau of Indian Affairs is increasing the cost of electric power (energy) to customers of Mission Valley Power (MVP), the entity operating the power facility of the Flathead Indian Irrigation Project of the Flathead Reservation. The Bureau of Indian Affairs (BIA) has been informed that the Montana Power Company (MPC), which sells electric power to MVP, has raised its wholesale power rates by approximately 2.0 percent. The MPC increase went into effect on September 5, 1995, and is based on adjustments in the Consumer Price Index pursuant to the Federal Energy Regulatory Commission license for MPC's Kerr Dam Hydroelectric Facility. Accordingly, the BIA is adjusting the local retail power rates charged by MVP to reflect the increased cost of purchased power.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →