BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Comercio internacional · 7/9/20111 min de lectura

Honey From Argentina: Notice of Extension of Time Limit for Preliminary Results and Partial Rescission of Antidumping Duty Administrative Review

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce (the Department) is rescinding in part the administrative review of the antidumping duty order on honey from Argentina for the period of review (POR) of December 1, 2009, to November 30, 2010, with respect to ten companies. This rescission, in part, is based on the timely withdrawal of the request for review by the interested parties that requested the review. A complete list of the companies for which the administrative review is being rescinded is provided in the background section below. Additionally, the Department is extending the preliminary results of this administrative review to no later than December 1, 2011.

Idioma original de la fuente: Federal Register — Department of CommerceAbrir el comunicado original →